-
Turnaround of a production plant in the automotive industry (body-in-white)
-
Restore full customer satisfaction in 11 months
-
Achieving and sustainably securing a clearly positive operating result within 2 years
-
Achievement of all required certifications (e.g. IATF 16949) in the first “ramp-up” and without major deviation
-
Improvement from C-supplier according to VDA 6.3 to A-supplier in 3 years
-
Collective bargaining (incl. ERA introduction) with IG-Metall and a win-win agreement
Podcast Video
-
More than 15 years of successful, international project management in the automotive industry
-
From a 1-man project team to support and coordination to the management of a large project
-
From the simultaneous engineering phase to final acceptance and support in series production
-
From small projects to 3-digit million investment projects and cycle times from 45 seconds to 12 minutes
-
In Austria, Germany, Canada, USA, Mexico, Spain, Poland, Slovakia, Hungary, Russia and South Korea
Projekt extract:
-
Three fully automated body shops
-
A third-party product integration into an existing production line
-
A fully automated production line for a body platform with 10 variants
-
A large number of production cells and lines for structural and outer skin component groups
-
Validation and optimization of manufacturing concepts
-
Prozessoptimierung am Shop Floor (Maschinen- und Mitarbeiter-Taktzeiten, Anlagenverfügbarkeiten, Materialfluss etc.)
-
Process optimization on the store floor (machine and employee cycle times, equipment availability, material flow, etc.)
-
Takeover and management as well as hands-on implementation of time-, cost- and quality-critical projects in Germany, Spain, Russia and South Korea
-
Plant and process planning for body-in-white production (incl. standardization)
-
Design of manual, partially and fully automated production concepts with consideration of LEAN principles
-
Creation of flexible manufacturing cell and production line concepts and their implementation
-
Specification and development of process planning tools for more efficient planning and costing
-
Digitalization of process planning (with Siemens Tecnomatix tools)
-
Development and introduction of (global) process standards in body-in-white planning
-
Introduction of innovative manufacturing processes and equipment technologies
-
Optimization of store floor management through visualization, digitalization and LEAN methods
-
E.g. introduction of KPI charts, Andon boards, 8D reports for error analysis and correction, 5S optimizations
Support and sub-project management for global plant construction projects:
-
Plant and fixture construction in Mexico (green field)
-
Production plant in Germany (brown field)
-
Production plant in Spain (brown field)
-
Production hall (part of the complete plant) in Austria (brown field)
-
The brown field projects were always combined with product startups (body-in-white)
-
New establishment and development of planning teams in the course of projects in Austria, Germany, Spain and Canada
-
Over 20 years of experience in disciplinary as well as functional management in projects, line and matrix organizations
-
Management and reorganization of a production plant in Germany with 330 employees.
-
Price negotiations for component groups, machines, plants and devices with OEMs (Audi, BMW, Daimler, Porsche, VW) as well as machine and plant manufacturers; for basic orders and later change costs
-
Extensive negotiations with works councils on company agreements, shift models, etc. and IG-Metall on an in-house collective agreement