MY EXPERTISE

Turnaround

  • Turnaround of a production plant in the automotive industry (body-in-white)
  • Restore full customer satisfaction in 11 months
  • Achieving and sustainably securing a clearly positive operating result within 2 years
  • Achievement of all required certifications (e.g. IATF 16949) in the first “ramp-up” and without major deviation
  • Improvement from C-supplier according to VDA 6.3 to A-supplier in 3 years
  • Collective bargaining (incl. ERA introduction) with IG-Metall and a win-win agreement

Podcast Video

Project Management

  • More than 15 years of successful, international project management in the automotive industry
  • From a 1-man project team to support and coordination to the management of a large project
  • From the simultaneous engineering phase to final acceptance and support in series production
  • From small projects to 3-digit million investment projects and cycle times from 45 seconds to 12 minutes
  • In Austria, Germany, Canada, USA, Mexico, Spain, Poland, Slovakia, Hungary, Russia and South Korea
Projekt extract:
  • Three fully automated body shops
  • A third-party product integration into an existing production line
  • A fully automated production line for a body platform with 10 variants
  • A large number of production cells and lines for structural and outer skin component groups

Optimizations

  • Validation and optimization of manufacturing concepts
  • Prozessoptimierung am Shop Floor (Maschinen- und Mitarbeiter-Taktzeiten, Anlagenverfügbarkeiten, Materialfluss etc.)
  • Process optimization on the store floor (machine and employee cycle times, equipment availability, material flow, etc.)
  • Takeover and management as well as hands-on implementation of time-, cost- and quality-critical projects in Germany, Spain, Russia and South Korea

Planning

  • Plant and process planning for body-in-white production (incl. standardization)
  • Design of manual, partially and fully automated production concepts with consideration of LEAN principles
  • Creation of flexible manufacturing cell and production line concepts and their implementation
  • Specification and development of process planning tools for more efficient planning and costing
  • Digitalization of process planning (with Siemens Tecnomatix tools)
  • Development and introduction of (global) process standards in body-in-white planning
  • Introduction of innovative manufacturing processes and equipment technologies

Shopfloor Management

  • Optimization of store floor management through visualization, digitalization and LEAN methods
  • E.g. introduction of KPI charts, Andon boards, 8D reports for error analysis and correction, 5S optimizations

Green and Brown Field

Support and sub-project management for global plant construction projects:
  • Plant and fixture construction in Mexico (green field)
  • Production plant in Germany (brown field)
  • Production plant in Spain (brown field)
  • Production hall (part of the complete plant) in Austria (brown field)
  • The brown field projects were always combined with product startups (body-in-white)

Leadership

  • New establishment and development of planning teams in the course of projects in Austria, Germany, Spain and Canada
  • Over 20 years of experience in disciplinary as well as functional management in projects, line and matrix organizations
  • Management and reorganization of a production plant in Germany with 330 employees.

Negotiations

  • Price negotiations for component groups, machines, plants and devices with OEMs (Audi, BMW, Daimler, Porsche, VW) as well as machine and plant manufacturers; for basic orders and later change costs
  • Extensive negotiations with works councils on company agreements, shift models, etc. and IG-Metall on an in-house collective agreement